Welcome to SAUTER Group
If you have any questions or need to talk to an expert,
we will gladly direct you to the right person.
Country Selection
Review of trade fairs
Big 5 2008, Dubai
aqua-therm 2008, Prague
HiTechHouse 2008, Moscow
SAUTER is strengthen-ing its presence in the Middle East
FACTS No. 20, 2/2008
St. Josef Hospital, Hermeskeil
Health
Project: Hospital
User: St. Josef Hospital, Hermeskeil
Location: Hermeskeil, Germany
Object Information
The St. Josef Hospital dates back to the second half of the 19th century when the community of Franciscan nuns from Waldbreitbach in Hermeskeil provided care for patients and training in domestic science for girl school-leavers. In 1904, the hospital was rebuilt at its current premises.
At present, the St. Josef Hospital has five specialist departments with a total of 181 beds. An energy-supply contract over fifteen years has been signed with SAUTER FM.
Task
To reduce heating and energy costs, and to reduce CO2 emissions, the following energy-efficiency measures were introduced:
> Complete renewal of the heat generation system; use of low-temperature boilers with waste-gas heat recovery
> Employment of highly-efficient steam boilers with waste-gas heat recovery
> Generation matched to demand
> Employment of Sauter DDC control system with optimised settings, analysis functions and operational monitoring
> Renewal/optimisation of the hydraulic circuits
> Establishment of an energy-management system: recording of consumption levels; monitoring of the degree of efficiency; assessment of the users of energy
Management level: SAUTER EY3600
Information materials



